Abstract
This deliverable has the structure of the periodic report that is usually submitted before a review. It contains the work, progress, results, etc. for the time period between M19 and M30, and is intended to serve as a summary of the work to be reviewed at the 2nd review meeting scheduled for 24 March 2025.